tasks: tasks.md sync left behind by PR #3 merge #4

Merged
steve merged 1 commits from tasks-md-phase5-sync into main 2026-05-04 10:26:42 +01:00

1 Commits

Author SHA1 Message Date
steve cd510d2032 tasks: collapse Phase 5 header + fix P2R-03/04 cadence cross-refs
CI / Lint (pull_request) Successful in 19s
CI / Build (windows/amd64) (pull_request) Successful in 18s
CI / Build (linux/arm64) (pull_request) Successful in 18s
CI / Build (linux/amd64) (pull_request) Successful in 44s
CI / Test (linux/amd64) (pull_request) Successful in 1m23s
The Phase 5 section had drifted from the convention used by phases
1–4 (single section header carrying , no separate summary block).
Collapse to the existing pattern; fold the summary into a blockquote
sitting right under the header.

While there: P2R-03 and P2R-04 still carried forward-references
saying "cadence-driven dispatch lands in P2R-04 / P2R-05". Both
should point at P2R-06 (the maintenance ticker), not the next item
in the list. Updated descriptions to reflect what actually shipped:
LatestJobByKind anchor includes in-flight jobs, ForgetGroups
multi-group payload reshape, repo.stats envelope shape, per-host
drain mutex.
2026-05-04 10:26:24 +01:00